Smart Equipment Manufacturing
Cabinet, structure, finish, wiring and final test in one plant — for vending machines, parcel and storage lockers, energy storage, battery swapping and other self-service equipment.
A machine is a cabinet, a mechanism and an interface — we cover the first two in-house
Self-service and energy equipment is usually a sheet metal enclosure with compartments, doors, a terminal cut-out, a locking system and a coated exterior. That is exactly what our fabrication plant produces. Building the machine here means the enclosure does not travel between a cabinet supplier and an assembler, and the tolerances that decide whether doors line up are owned by one team.
We support complete-machine builds for vending, parcel delivery, storage, energy storage, battery exchange and charging, including projects where the customer supplies the control system and payment modules. We do not claim in-house development of those systems.
See the OEM / ODM process
A complete enclosure leaves the plant assembled and checked.
Vending Machines
Snack, drink and combined cabinets, built as a coated steel body with a glass front, shelf or spiral delivery, a terminal cut-out and service access. We build the cabinet, the tray system, the door and the assembly; the payment terminal and telemetry are integrated to your specification.
- Body, door and glass front
- Spiral, belt or shelf delivery
- Terminal and lock cut-outs
- Powder-coated, colour matched
Parcel Lockers & Storage Lockers
Parcel banks for last-mile delivery and storage cabinets for staff, visitors and luggage. Compartment geometry, door stiffness, lock mounting and terminal position are set per project; the exterior coating is specified for indoor or outdoor use.
- Modular compartment grids
- Reinforced leaves and hinge positions
- Terminal, printer and camera cut-outs
- Indoor or exterior-grade coating
Energy Storage Equipment & Battery Enclosures
Battery cabinets and racks built as a structural steel enclosure with ventilation, cable routing and a coated exterior. The battery modules, BMS and thermal hardware are supplied to the project; the cabinet and its mechanical integration are ours.




Battery swapping cabinets
Multi-bay cabinets for two-wheeler battery exchange, with bay layout, ventilation and lock provision agreed per battery format. Built as a steel structure with a coated exterior and service access.
Charging cabinets & pile housings
Cabinet bodies for multi-port charging with terminal cut-outs and cable management provisions, plus pile and pedestal housings for outdoor charging with weather-grade coating.
Photographs. We do not publish a stock or generated image for the swap and charging family. Sample cabinets and the current build list are shown on a plant visit or sent on request. Request photographs and drawings.
Other customized self-service equipment
Ticket machines, self-checkout units and other terminals are built to a specification: enclosure geometry, ergonomics, screen and printer cut-outs, service access, internal mounting structure and the finished surface.
Units are assembled and function-checked before packing. Interface definitions, power requirements and integration points are captured in a build document so the customer knows exactly what arrives.
- DeliverablesEnclosure, structure, finishing, assembly and test record
- Customer scopeElectronics, software, payment and certification per project
- DocumentationAssembly drawings, interface list and packing specification
Five stages from requirement to inspected unit
The same route as the company profile: design development, sheet metal work, surface treatment, assembly and final test — all under one roof.
Design development
Structure and enclosure developed from a drawing, a sample or a functional requirement.
Sheet metal work
Laser cutting, punching, bending, riveting and welding on our own equipment.
Surface treatment
Phosphating or ceramic conversion, then powder coating with colour matching.
Assembly
Wiring, hardware, module fitting and the customer's electronics integrated to the agreed drawing.
Final test
Function check, eight dispatch checks and packing before the unit is released.